A modern, green and highly efficient community has been constructed in Vallda Heberg. Osby Parca delivered one P500 and the controls.
Scope of supply
One 300 kW P500 biomass boiler and a Trio 500 kW oil back-up boiler. Delivered with a AC500 control system and all associated function and safety ancillaries, ash handling equipment, multi-cyclone and flue gas fan.
Installation Description
In Vallda Heberg a local real estate company has built an environmental passive house area that consists of dozens of houses and apartment buildings, an old people’s home, a nursery school, and premises for businesses. Passive houses are built to be energy efficient by, for instance, not releasing waste heat and using various energy sources.
Operation features
The main heat source of the area is sun power. The Trio oil boiler automatically ignites should the control system demand a higher output. The automatic ash handling system transports the ash to an ash well. The boiler system is monitored by an AC700 control system, which is prepared for handling one more boiler when the area expands.
Location | Heberg, Sweden |
Delivered boiler(s) | 1 pc. P500 |
Fuel | Wood pellets |
Annual power usage | approx. 1700 MWh |
Annual savings | approx. 140 000 EUR |
Annual CO2 savings | approx. 1500 tonnes |